Fredy Saavedra Valderrama
ElectromechanicalEngineer, Master of Science (M.Sc.)
Type of Principal Experience: Design, Supervisionand operation of Hydro power plants
Background: Operation and Maintenance Electric Power Plant
Year from/to: | Country:: | Project and Position: |
2002- Present |
Peru |
Operation and maintenance Hydroelectric Machupicchu I phase (90 MW). Production Manager Cusco |
2004-2006 |
Peru |
Hydroelectric Machupicchu I phase (90MW). Implementation Certification ISO 9001, ISO 14001, OHSAS 18001. Cusco. |
2001 |
Peru |
Rehabilitation Machupicchu Hydroelectric Phase I (90MW).- Cusco. Supervisor electromechanical works. |
2000 |
Peru |
Rehabilitation Machupicchu Hydroelectric Phase I (90MW).- Cusco. Responsible Electromechanical Works and Heavy Machinery. |
1998-2000 |
Peru |
Operation and maintenance Taparachi Diesel Thermal Power Plant (7 MW) Juliaca - Puno. Head of Central. |
1995-1998 |
Peru |
Operation and maintenance Puerto Maldonado Diesel Thermal Power Plant (4 MW) Operation and maintenance Iberia Diesel Thermal Power Plant (0.6 MW) Operation and maintenance Iñapari Thermal Power Plant (100 KW). Madre de Dios. |
Background: Design, Supervision Electric Power Plant
Year from/to: | Country:: | Project and Position: |
2010 - Present |
Peru |
Hydroelectric Project C.H. Machupicchu II phase Engineer of Supervision. Cusco EGEMSA |
2012 |
Peru |
Design and supervision of definitive studies for the Marcapata Hydroelectric (1 x 1.5 MW). Cusco. Municipalidad Marcapata. |
2008 - 2009 |
Peru |
Design and supervision of definitive studies for Santa Teresa Hydroelectric (2 x 45 MW). EGEMSA. Cusco. |
2007 - 2008 |
Peru |
Design and supervision of definitive studies for II phase C.H. Machupicchu (1 x 90 MW). Cusco. EGEMSA. |
2001 |
Peru |
Rehabilitation Machupicchu Hydroelectric Phase I (90MW). - Cusco. EGEMSA. Supervisor of Design and assembly of electromechanical works. |
|