PROJECTS SpecificallyFeasibility Study and Finance Providing, Hydroelectric System BermejoElaboration of Feasibility Study and Finance Providing for Hydroelectric System Bermejo (274 MW), consisted of Dam Las Pavas (rollcrete, height of 115 m, 86 MW), Dam Arrazayal (rollcrete, height of 120 m, 86 MW) and Dam Cambari (arch dam, height of 146 m, 102 MW), for the TRANSDAM Joint Venture, Buenos Aires, Argentina, in the frame of the international bidding for the concession of the project Bermejo located on the High Basin of the River Bermejo of Tarija (Binational Agreement Bolivia- Argentina) Service scope:
Service value:
Projects amount:
Service time:
|
Copyright 2012 © Transproject | All rights reserved