Year from/to:Country:Project and Position:
2005 - Present Ex-Yugoslavia: Serbia, Montenegro, Bosnia & Herzegovina Projects: 1. Urban Water Supply and Sewerage System in Banja Luka, (pipes length 36km, reservoirs etc.), 2. Rehabilitation of “Gazela” bridge over river Sava in Belgrade (total length 3710 m), 3. The regional water supply for Montenegrin See Coast, 4. Business Centre in Belgrade of 15 000 m2, including three levels underground garages; Total USD 150,000,000. Construction Manager or Project Manager / Head of Supervision
1996-2005 Nigeria Ministry Complex with 60 000 m2, Kiri Dam, Irrigation System Kano 17 000ha Extension of Airport Kaduna, three bridges and several road projects. Managing Director of Nigerian Engineering and Construction Company ltd
1990 -1996 Kenya, Uganda, Mozambique, Libya, Drinking water supply (40 km), six pumping station, water reservoirs and other water supply projects etc. General and Chef Coordinator
1988-1990 Iraq Badush I fill dam at the river Tigris (Incorporate 24 million m3 of different material, Bridge Constructing over the river Tigris (180 m long), on pile foundation in the river Tigris, Preparing on stock 12 million m3 of gravel, Construction conveyor belt over river Tigris to supply aggregate etc., USD 800,000,000). Senior Chief Engineer
1986-1988 Yugoslavia Federal Ministry for Measurement, Design and Investment Consulting for the Sea  and River Constructions.
1984-1986 Turkey Construction of a new Synchro lift in Izmir (10 000 ton capacity done one part on shore and other part off shore, ship yard, structure foundation lies on: 10,000 boring piles, depths from 35 m up to 70 m, , ON SHORE piers are lying on steel driving piles OFF SHORE, value USD 200,000,000.) Consulting Chief Engineer
1980-1984 Yugoslavia Flood Regulation of the rivers: Sava & Danube in Belgrade (USD 12,000,000). Chief Engineer
1975-1980 Libya Commercial Sea Port Misurata (Jetty foundation on the steel driving pipe in 18 m depth sea water from shore 1,500 m long, with accessories for unloading crude oil from the tanker; under sea pipe line in seabed 10-15 deep sea water, diameter 3,5 m, length 1,000 m, underwater channel was backfilled, after pipe placed, USD 200,000,000 Project Manager / Head of Supervision
1973 - 1975 Serbia Hydro-System Ibar-Lepenac (23 000 ha, Main canal 12 m width and 3 m deep, with length of: 120 km + 110 km, USD 220,000,000). System Engineer for Construction
1971- 1973 Montenegro Rehabilitation & Extension of Molo I done on the driving pile and construction of New Synchrolift on the pile in Tivat, USD 15,000,000). Project Manager