Year from/to: | Country: | Project and Position: |
2010 - 2012 |
Latium, Central Italy |
Salaria State Road and Rome-Florence Railway: Design of the new Vallericca Underpass and Roundabout.Structural Consultant |
2010 - 2012 |
Piedmont,Northern Italy |
Hydrologic and hydraulic studies and risk assessment of six Railway Bridges in the Turin Department (crossings of DoraRiparia,Prebech and Vermenagna Rivers). Hydraulic Consultant |
2010 - 2012 |
Liguria, Northern Italy |
Borghetto River Bridge (L=20m) on the Genoa–Ventimiglia Railway Line: detailed structural design of the steel bridge.Structural Consultant. |
2007 - 2009 |
Piedmont, Northern Italy |
Hydrologic and hydraulic studies and risk assessment of four Railway Bridges in the Turin Department (crossings of Sesia, Elvo,Rovasanda and Gesso Rivers). Hydraulic Consultant. |
2007 - 2009 |
Port of Civitavecchia, Central Italy |
Port of Civitavecchia Terminal: strengthening design of 4No steel silos (Ф12.5m, H=28.5m). ChiefEngineer for the subsequent relocation of the entire industrial facility.Structural Consultant. |
2007 - 2008 |
Latium, Central Italy |
Cavata River Bridge, (L=19.65m, built yr1928) on the Roma–Formia Railway Line: structural assessment of the steel bridge,FEM analyses, detailed design of the strengthening.Structural Consultant. |
2007 - 2008 |
Abruzzo,Central Italy |
MonteBove Tunnel (L=3939m, built yr1886) on the Roma–Pescara Railway Line: design of a new chamber and of thetemporary steel structures that will support the rock mass during spritz-beton casting.Structural Consultant. |
2007 - 2008 |
Milan, Northern Italy |
Detailed design of the steel structures of Buildings Nos.3 & 4 of the ComplessoImmobiliare “RIPAMONTI LORENZINIMARELLI” in Central Milan.Structural Consultant |
2007 - 2008 |
Campania, South of Italy |
S.Giovanni Barra Railway Station: design of the temporary sheet piling (reinforced jet-grouting) for the underpass.Structural Consultant |
2007 |
Emilia-Romagna, Northern Italy |
New Layout of BorgoPanigaleRaylway System – Axis No. 3. : Bencivenni Road. Structural Consultant |
2005 - 2006 |
Basilicata, South of Italy |
Viaducts of the 3rd Lot-2nd Reach of State Highway No.655 (aka Bradanica ): detailed design. Structural Consultant |
2005 |
Pistoia, Tuscany, Italy |
Pistoia Lucca Pisa Railway Line - Pistoia-Montecatini Reach: hydrologic and hydraulic studies and river works design for thedetailed design of the Railway.Hydraulic Consultant |
2005 |
Puglia, South of Italy |
Bari - Taranto Railway Line: hydrologic and hydraulic studies for the detailed design of the Railway. Hydraulic Consultant |
2005 |
Sicily, South of Italy |
40km of Railway Lines servicing the new Bridge across the Strait of Messina: hydrologic and hydraulic studies for the detaileddesign of the Railways. Hydraulic Consultant. |
2002 - 2004 |
Port of Civitavecchia, Central Italy |
Italian Railways' Terminal at the Port of Civitavecchia: structural design of a new lift bridge (L=30.00m) in steel and r.c.caissons (7.25x27.00m, H=10.50-15.00m). Structural Consultant |
2000 - 2002 |
Rome, Italy |
Detailed design of the timber, steel &r.c. structures of the New Students Common Room, 3rd University of Rome.Structural Consultant |
2001 |
Basilicata, South of Italy |
State Highway No.95 (aka di Brienza ) - 6th Lot 1st-2nd Reach: hydrologic and hydraulic studies and river works design. Hydraulic Consultant |
2001 |
Florence, Tuscany, Italy |
City of Florence - Leopoldo Sq. Development in Central Florence (50,000cu.m office and residential blocks). Hydraulic Consultant. |
2000 |
Umbria, Central Italy |
Spoleto-Campello Railway Line: Hydrologic and hydraulic studies and river works design for the detailed design of the Railway.HydraulicConsultant. |
2000 |
Liri River, Central Italy |
Construction of Liri River (near Rome) Flood Alleviation Schem. Structural Consultant. |
1999 |
Basilicata, South of Italy |
Viaducts of the Link between Melfi-Potenza Expressway and the City of Venosa: design of the isolation system including rubber bearings and fluid viscous dampers. Structural Consultant. |
2000 |
Basilicata,South of Italy |
State Highway No.106 (aka Ionica ) - 3rd Lot-1st Reach: hydrologic and hydraulic studies and river works design. Hydraulic Consultant. |
2000 |
Puglia, South of Italy |
Marinella-Altamura Railway: hydrologic and hydraulic studies and river works designer for the detailed design of the Railway. Hydraulic Consultant. |
1999 |
Veneto, Northern Italy |
Rudavoi Creek Bridge Competition: feasibility study and architectural design of a new 105m span prestressed concrete bridge. Structural Consultant. |
1999 |
Prato, Tuscany, Italy |
1st and 2nd Lot of 2nd Prato West Ring Expressway: hydrologic and hydraulic studies, design of pumping stations. Hydraulic Consultant. |
1999 |
Puglia, South of Italy |
Bari - Lecce Railway Line: hydrologic and hydraulic studies for the detailed design of the Railway. Hydraulic Consultant. |
1999 |
Campania, South of Italy |
Construction of a 100,000cu.m Embankment Reservoir in the vicinity of the City of San Lupo:hydrologic and hydraulic studies of the reservoir and irrigation scheme. Hydraulic Consultant |
1998 |
Basilicata, South of Italy |
State Highway No.655 (aka Bradanica ) - 3rd Lot-1st Reach: hydrologic and hydraulic studies and river works design. Hydraulic Consultant |
1998 |
Florence,Tuscany, Italy |
River Arno Bridge Competition, including a new tramway bridge and a new arrangement of Paolo Uccello Square, CentralFlorenc. Structural Consultant. |
1997 |
Rome, Italy |
Construction of Reservoir No.2 (20,000cu.m): hydraulic studies. Hydraulic Consultant |
1995 - 1997 |
Riyadh, Saudi Arabia |
WadiLeban Cable - Stayed Bridge (Riyadh, Saudi Arabia): conception, detailed structural design and load tests. Structural Consultant. |
1993-1995 |
Arezzo,Tuscany, Italy |
Stia-Arezzo-Sinalunga Railway: hydrologic and hydraulic studies and river works design for the detailed design of the Railway. Hydraulic Consultant |
1989 - 1994 |
Various locations, Italy |
Maddaloni-Marcianise New Switching and Parking Cargo Facility project. Stia-Arezzo-Sinalunga Railway, including two skewed steel bridges on the Arno River etc. Senior Structural Engineer |
1992 |
Piombino, Tuscany, Italy |
Tender for theconstruction of the Piombino Ring Main Pipe for the water supplying of Island of Elba. Hydraulic Consultant |
1992 |
Maremma, Tuscany, Italy |
Tender for the construction ofthe intake works from La Nova Spring (near Pitigliano) and of the distribution pipe. Hydraulic Consultant |
1991 |
Island of Elba, Tuscany, Italy |
Tender for the construction ofwater distribution system of Island of Elba. Hydraulic Consultant |
1989 |
City of Tolentino, Marche, Italy |
Tender for the construction of the intake works from Valcimarra Spring (near Tolentino) and of the distribution pipe. Hydraulic Consultant |
1988 |
Latium, CentralItaly |
Tender for the construction of Sacco River (near Rome) Flood Alleviation Scheme. Structural Consultant |
1987 - 1988 |
Various locations, Italy |
Responsible for the development of the company's inhouse technical computer design and analysis capability.Feasibility, optimization studies and detail hydraulic designs for a number of irrigation systems. Project Engineer |
1986 - 1987 |
Rome, Italy |
Department of Hydraulic Engineering (Dept. No.37), University of Rome "La Sapienza". Engaged in several researchprojects with Prof-Ing G Calenda and Prof-Ing R Guercio.Assistant Research Engineer |