Español(Spanish Formal International)English (United Kingdom)

Marco de Pellegrin

Civil Engineer, Bachelor of Science (B.Sc.)

Type of Principal Experience: 22 years of experience in the design and supervision of civil infrastructure andrailway projects (bridges, viaducts, tunnels, dams, industrial plants, office buildings,etc.) in Italy and abroad

Year from/to:Country:Project and Position:
2010 - 2012 Latium, Central Italy Salaria State Road and Rome-Florence Railway: Design of the new Vallericca Underpass and Roundabout.Structural Consultant
2010 - 2012 Piedmont,Northern Italy Hydrologic and hydraulic studies and risk assessment of six Railway Bridges in the Turin Department (crossings of DoraRiparia,Prebech and Vermenagna Rivers). Hydraulic Consultant
2010 - 2012 Liguria, Northern Italy Borghetto River Bridge (L=20m) on the Genoa–Ventimiglia Railway Line: detailed structural design of the steel bridge.Structural Consultant.
2007 - 2009 Piedmont, Northern Italy Hydrologic and hydraulic studies and risk assessment of four Railway Bridges in the Turin Department (crossings of Sesia, Elvo,Rovasanda and Gesso Rivers). Hydraulic Consultant.
2007 - 2009 Port of Civitavecchia, Central Italy Port of Civitavecchia Terminal: strengthening design of 4No steel silos (Ф12.5m, H=28.5m). ChiefEngineer for the subsequent relocation of the entire industrial facility.Structural Consultant.
2007 - 2008 Latium, Central Italy Cavata River Bridge, (L=19.65m, built yr1928) on the Roma–Formia Railway Line: structural assessment of the steel bridge,FEM analyses, detailed design of the strengthening.Structural Consultant.
2007 - 2008 Abruzzo,Central Italy MonteBove Tunnel (L=3939m, built yr1886) on the Roma–Pescara Railway Line: design of a new chamber and of thetemporary steel structures that will support the rock mass during spritz-beton casting.Structural Consultant.
2007 - 2008 Milan, Northern Italy Detailed design of the steel structures of Buildings Nos.3 & 4 of the ComplessoImmobiliare “RIPAMONTI LORENZINIMARELLI” in Central Milan.Structural Consultant
2007 - 2008 Campania, South of Italy S.Giovanni Barra Railway Station: design of the temporary sheet piling (reinforced jet-grouting) for the underpass.Structural Consultant
2007 Emilia-Romagna, Northern Italy New Layout of BorgoPanigaleRaylway System – Axis No. 3. : Bencivenni Road. Structural Consultant
2005 - 2006 Basilicata, South of Italy Viaducts of the 3rd Lot-2nd Reach of State Highway No.655 (aka Bradanica ): detailed design. Structural Consultant
2005 Pistoia, Tuscany, Italy Pistoia Lucca Pisa Railway Line - Pistoia-Montecatini Reach: hydrologic and hydraulic studies and river works design for thedetailed design of the Railway.Hydraulic Consultant
2005 Puglia, South of Italy Bari - Taranto Railway Line: hydrologic and hydraulic studies for the detailed design of the Railway. Hydraulic Consultant
2005 Sicily, South of Italy 40km of Railway Lines servicing the new Bridge across the Strait of Messina: hydrologic and hydraulic studies for the detaileddesign of the Railways. Hydraulic Consultant.
2002 - 2004 Port of Civitavecchia, Central Italy Italian Railways' Terminal at the Port of Civitavecchia: structural design of a new lift bridge (L=30.00m) in steel and r.c.caissons (7.25x27.00m, H=10.50-15.00m). Structural Consultant
2000 - 2002 Rome, Italy Detailed design of the timber, steel &r.c. structures of the New Students Common Room, 3rd University of Rome.Structural Consultant
2001 Basilicata, South of Italy State Highway No.95 (aka di Brienza ) - 6th Lot 1st-2nd Reach: hydrologic and hydraulic studies and river works design. Hydraulic Consultant
2001 Florence, Tuscany, Italy City of Florence - Leopoldo Sq. Development in Central Florence (50,000cu.m office and residential blocks). Hydraulic Consultant.
2000 Umbria, Central Italy Spoleto-Campello Railway Line: Hydrologic and hydraulic studies and river works design for the detailed design of the Railway.HydraulicConsultant.
2000 Liri River, Central Italy Construction of Liri River (near Rome) Flood Alleviation Schem. Structural Consultant.
1999 Basilicata, South of Italy Viaducts of the Link between Melfi-Potenza Expressway and the City of Venosa: design of the isolation system including rubber bearings and fluid viscous dampers. Structural Consultant.
2000 Basilicata,South of Italy State Highway No.106 (aka Ionica ) - 3rd Lot-1st Reach: hydrologic and hydraulic studies and river works design. Hydraulic Consultant.
2000 Puglia, South of Italy Marinella-Altamura Railway: hydrologic and hydraulic studies and river works designer for the detailed design of the Railway. Hydraulic Consultant.
1999 Veneto, Northern Italy Rudavoi Creek Bridge Competition: feasibility study and architectural design of a new 105m span prestressed concrete bridge. Structural Consultant.
1999 Prato, Tuscany, Italy 1st and 2nd Lot of 2nd Prato West Ring Expressway: hydrologic and hydraulic studies, design of pumping stations. Hydraulic Consultant.
1999 Puglia, South of Italy Bari - Lecce Railway Line: hydrologic and hydraulic studies for the detailed design of the Railway. Hydraulic Consultant.
1999 Campania, South of Italy Construction of a 100,000cu.m Embankment Reservoir in the vicinity of the City of San Lupo:hydrologic and hydraulic studies of the reservoir and irrigation scheme. Hydraulic Consultant
1998 Basilicata, South of Italy State Highway No.655 (aka Bradanica ) - 3rd Lot-1st Reach: hydrologic and hydraulic studies and river works design. Hydraulic Consultant
1998 Florence,Tuscany, Italy River Arno Bridge Competition, including a new tramway bridge and a new arrangement of Paolo Uccello Square, CentralFlorenc. Structural Consultant.
1997 Rome, Italy Construction of Reservoir No.2 (20,000cu.m): hydraulic studies. Hydraulic Consultant
1995 - 1997 Riyadh, Saudi Arabia WadiLeban Cable - Stayed Bridge (Riyadh, Saudi Arabia): conception, detailed structural design and load tests. Structural Consultant.
1993-1995 Arezzo,Tuscany, Italy Stia-Arezzo-Sinalunga Railway: hydrologic and hydraulic studies and river works design for the detailed design of the Railway. Hydraulic Consultant
1989 - 1994 Various locations, Italy Maddaloni-Marcianise New Switching and Parking Cargo Facility project. Stia-Arezzo-Sinalunga Railway, including two skewed steel bridges on the Arno River etc. Senior Structural Engineer
1992 Piombino, Tuscany, Italy Tender for theconstruction of the Piombino Ring Main Pipe for the water supplying of Island of Elba. Hydraulic Consultant
1992 Maremma, Tuscany, Italy Tender for the construction ofthe intake works from La Nova Spring (near Pitigliano) and of the distribution pipe. Hydraulic Consultant
1991 Island of Elba, Tuscany, Italy Tender for the construction ofwater distribution system of Island of Elba. Hydraulic Consultant
1989 City of Tolentino, Marche, Italy Tender for the construction of the intake works from Valcimarra Spring (near Tolentino) and of the distribution pipe. Hydraulic Consultant
1988 Latium, CentralItaly Tender for the construction of Sacco River (near Rome) Flood Alleviation Scheme. Structural Consultant
1987 - 1988 Various locations, Italy Responsible for the development of the company's inhouse technical computer design and analysis capability.Feasibility, optimization studies and detail hydraulic designs for a number of irrigation systems. Project Engineer
1986 - 1987 Rome, Italy Department of Hydraulic Engineering (Dept. No.37), University of Rome "La Sapienza". Engaged in several researchprojects with Prof-Ing G Calenda and Prof-Ing R Guercio.Assistant Research Engineer